Trans Canada Pipeline (Nosehill Creek HDD)

The Nosehill Creek section would be approximately 3.5 km of 1067 mm (42 inch) outside diameter pipeline and it would parallel the existing pipelines The Nosehill Creek section includes a 1.1 Km HDD crossing of the Athabasca River.

The Safety & Emergency Response lead establishes response relationships with local emergency services, is the most senior health and safety subject matter expert at site and  provided extensive guidance and support to the Project Management Team, and inspection personnel.

Aaron Braaten (6 Posts)

Aaron Braaten is a former Surveyor and Economist turned Safety Consultant. He has worked for Moody's, The Alberta Energy Regulator, best selling authors and Nobel Prize winners. As the President of Xi Safety, he is developing a new approach to HSE called SafeNomics, which balances, production, people and planet. He holds a Master's Degree in Economics from the University of Alberta, in addition to other certifications through NEBOSH and the Alberta Construction Safety Association.


Author: Aaron Braaten

Aaron Braaten is a former Surveyor and Economist turned Safety Consultant. He has worked for Moody's, The Alberta Energy Regulator, best selling authors and Nobel Prize winners. As the President of Xi Safety, he is developing a new approach to HSE called SafeNomics, which balances, production, people and planet. He holds a Master's Degree in Economics from the University of Alberta, in addition to other certifications through NEBOSH and the Alberta Construction Safety Association.